Lifou Island Resort

Facebook
Twitter
LinkedIn

Viking Containment in conjunction with ACGM SARL based in New Caledonia have completed the liner system for the Intercontinental Lifou Island Resort.

The Wadra Lagoon has a natural look with a sand base and saltwater cycling every 24 hours. The liner system comprised 8,000 m² Flexishield RPP with a Texshield geotextile protection layer used above and below the liner.

More to explorer

VOH Wastewater Treatment Plant

Viking was commissioned by ACGM SARL to rehabilitate the liner system for three lagoons at the VOH WWTP. The waveband application utilised

Scroll to Top